Filter by
PNB incorporated on 17 March 1978, PNB was conceived as a pivotal instrument of the Government's New Economic Policy to promote share ownership in the corporate sector among the Bumiputera (son of the soil), and to develop opportunities for deserving Bumiputera professionals to participate in the creation and management of wealth.
PNB has emerged as the country's premier investment institution. As an investment vehicle for the Yayasan Pelaburan Bumiputra (YPB), the core function of PNB is to evaluate, select and acquire a sound portfolio of shares in limited companies with growth potential. Being an organisation that specialises in investment, PNB in essence acts as a warehouse, whereby shareholdings in these limited companies are placed in trust funds and sold to unit holders in the form of smaller units.
Developer; Owner (Buildings, Land); Property Management
Please note that all heights shown in italics/red are estimated heights. These have been calculated based on known floor counts for the building, then extrapolated through analyzing typically hundreds of buildings of the same function on this database that do have confirmed heights. The user should be aware that non-standard building features, such as significant spires or raised entrances / podiums, may affect the accuracy of these estimations.
Rank
|
Name
|
Status
Completed Architecturally Topped Out Structurally Topped Out Under Construction On Hold Proposed Vision Never Completed Demolished Competition Entry Canceled Proposed Renovation Under Renovation Renovated Under Demolition |
Completion
|
Height
|
---|---|---|---|---|
1 |
2023 |
678.9 m / 2,227 ft |
||
2 |
2021 |
151 m / 495 ft |
||
3 |
2003 |
105 m / 344 ft |
||
4 |
2021 |
103.8 m / 341 ft |
||
5 |
2022 |
64 m / 210 ft |
||
6 |
2023 |
- m / - ft |
22 May 2018
Five Minutes With: Karl Fender
Karl Fender, founding partner at Fender Katsalidis, sat down with CTBUH to discuss a number of his firm's projects, including the PNB 118 Tower in...
28 December 2019
Tall Buildings of the Future as Seen From the Present
Aerodynamic damping through the use of vertical long slots reduces the dynamic component of the wind loads on the building. Seminal examples include the three-legged...
15 June 2022
Images Revealed of Hotel Renovated Near London Power Station
Images of London's first art'otel have today been unveiled ahead of its opening at Battersea Power Station later in 2022. Spanish artist and designer, Jaime Hayon,...
Please note that all heights shown in italics/red are estimated heights. These have been calculated based on known floor counts for the building, then extrapolated through analyzing typically hundreds of buildings of the same function on this database that do have confirmed heights. The user should be aware that non-standard building features, such as significant spires or raised entrances / podiums, may affect the accuracy of these estimations.
Rank
|
Name
|
City
|
Completion
|
Height
|
---|---|---|---|---|
1 |
2023 |
679 m / 2,227 ft |
||
2 |
2021 |
151 m / 495 ft |
||
3 |
2003 |
105 m / 344 ft |
||
4 |
2021 |
104 m / 341 ft |
||
5 |
2022 |
64 m / 210 ft |
||
6 |
2023 |
- m / - ft |
||
7 |
2025 |
- m / - ft |
Average Building Age*
8 Years
Most Common Function*
Mixed-use (50%)
Most Common Material*
Composite (100%)
* Based on 150 m+ buildings currently in the database
NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.
Create your own charts using the Explore Data tool.
22 May 2018 | Sydney
Karl Fender, founding partner at Fender Katsalidis, sat down with CTBUH to discuss a number of his firm's projects, including the PNB 118 Tower in...
31 October 2017 | Sydney
Karl Fender of Fender Katsalidis Architects is interviewed by Chris Bentley during the 2017 CTBUH Australia Conference.
18 October 2016 | Shenzhen
Hashimah Hashim of KLCC Property Holdings Berhad is interviewed by Chris Bentley during the 2016 CTBUH China Conference. Hashimah discusses the master planning and development...
17 October 2016 | Shenzhen
Monday October 17, 2016. Shenzhen, China. Karl Fender, Fender Katsalidis Architects, presents at the 2016 China Conference Session 4b: Other Asia Case Studies. Tall buildings...
17 October 2016 | Shenzhen
Monday, October 18, 2016. Shenzhen, China. Kipsan Beck of MahaNakhon, PACE and Karl Fender, of Fender Katsalidis Architects, answer questions at the end of 2016...
16 October 2016 | Shenzhen
Karl Fender of Fender Katsalidis Architects is interviewed by Chris Bentley during the 2016 CTBUH China Conference. Karl discusses the design concept for Merdeka PNB118...
16 October 2016 | Shenzhen
Abrar Sheriff of Turner International is interviewed by Chris Bentley during the 2016 CTBUH China Conference. Abrar discusses the planning and construction process for supertall...
28 December 2019
SawTeen See, Robert Bird Group Pty Ltd
Aerodynamic damping through the use of vertical long slots reduces the dynamic component of the wind loads on the building. Seminal examples include the three-legged...
17 October 2016
Karl Fender, Fender Katsalidis Architects; YM Tengku Dato’ Ab. Aziz Tengku Mahmud, PNB Merdeka Ventures SDN Berhad; Peter Ramstedt & David Terenzio Turner International LLC
Tall buildings embody objectives ranging from pure business to nation building. The KL118 Tower in particular represents these objectives and more as it successfully knits...
17 October 2016
Peter Ramstedt, Chien Jou Chen, Matthew Hennessy & David Terenzio, Turner International LLC
In the construction of tall towers a variety of pile testing methodologies are used. Piles can be tested for many purposes including the optimization of...
17 October 2016
CTBUH 2016 Conference Speakers
The CTBUH 2016 International Conference is being held in the three cities of the Pearl River Delta, the world’s largest “megacity,” projected to have 120...
31 December 2014
Daniel Safarik, Antony Wood, Marty Carver & Marshall Gerometta, CTBUH
An All-Time Record 97 Buildings of 200 Meters or Higher Completed in 2014 and 2014 showed further shifts towards Asia, and also surprising developments in...
15 June 2022
Images of London's first art'otel have today been unveiled ahead of its opening at Battersea Power Station later in 2022. Spanish artist and designer, Jaime Hayon,...
14 June 2022
Fletcher Priest Architects’ proposals to significantly overhaul a 1988 Skidmore, Owings, and Merrill office overlooking Exchange Square in Broadgate have been given the initial green...
08 June 2021
Permodalan Nasional Bhd’s (PNB) Merdeka 118 tower has safely topped out with the completion of the final roof slab after reaching its peak at level...
06 April 2021
New visualizations and a scheduled opening date have been revealed for a proposed glass lift, designed by WilkinsonEyre, inside one of Battersea Power Station’s landmark...
08 May 2020
Construction work at Permodalan Nasional Bhd’s (PNB) Merdeka 118 has been delayed by roughly two to three months due to restrictive measures taken to curb...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy