Population
2,615,060 (2011)
Area
630 km² • 243 mi²
Density
4,150.9 people per km²
10,750.8 people per mi²
First 150m+ Building
Tallest Building
by no. of 150m+ completed buildings
Tallest City in
the World
Tallest City in
Tallest City in
RANK
|
Name
|
Status
Completed Architecturally Topped Out Structurally Topped Out Under Construction On Hold Proposed Vision Never Completed Demolished Competition Entry Canceled Proposed Renovation Under Renovation Renovated Under Demolition |
Height
|
---|---|---|---|
1 | The One | 338.3 m / 1,110 ft | |
2 | SkyTower | 312.5 m / 1,025 ft | |
3 | Concord Sky | 299 m / 981 ft | |
4 | First Canadian Place | 298.1 m / 978 ft | |
5 | The St. Regis Toronto | 276.9 m / 908 ft | |
6 | Scotia Tower | 275 m / 902 ft | |
7 | Aura at College Park | 271.9 m / 892 ft | |
8 | Brookfield Place | 260.9 m / 856 ft | |
9 | One Bloor Street East | 257.3 m / 844 ft | |
10 | CIBC Square II | 243.1 m / 798 ft |
Logo
|
Name
|
Level
|
# of 150m+ buildings
|
|
---|---|---|---|---|
![]() |
Arup |
Platinum
|
383 | CIV • STRC • WIND • ENVE • PMNG • COST • FAC • FIRE • MEP • VERC |
![]() |
HOK, Inc. |
Platinum
|
83 | INTR • STRC • URB • ARCH • FIN • PMNG • COST • ENGM • FAC • FACS • HIST • SEIS |
![]() |
Thornton Tomasetti, Inc. |
Platinum
|
154 | CIV • STRC • URB • ARCH • ENVE • PMNG • COMP • ENGM • ENGO • FAC • FACS • FIRE • GEO • HIST • INSU • MEP • SEC • SEIS • TRAN |
![]() |
WSP |
Platinum
|
140 | CIV • INTR • STRC • URB • ENVP • PMNG • COMP • ENGO • FAC • FIRE • GEO • MEP • TRAN |
![]() |
GCL Builds |
Gold
|
0 | CON |
![]() |
Adamson Associates Architects |
Silver
|
33 | ARCH |
![]() |
Amexon Development Corporation |
Silver
|
1 | DEV |
![]() |
architectsAlliance |
Silver
|
44 | ARCH |
![]() |
B+H Architects |
Silver
|
21 | ARCH |
![]() |
BDP Quadrangle |
Silver
|
3 | URB • ARCH |
![]() |
Cast Connex |
Silver
|
6 | STRC • MATR |
![]() |
Cityzen Development Group |
Silver
|
6 | DEV • CON • OWN |
![]() |
Core Architects, Inc. |
Silver
|
5 | ARCH |
![]() |
Dream Unlimited |
Silver
|
4 | DEV • FIN |
![]() |
Entuitive Corporation |
Silver
|
10 | STRC |
![]() |
GG Canada Limited Partnership |
Silver
|
7 | DEV |
![]() |
Graziani + Corazza Architects Inc. |
Silver
|
9 | INTR • ARCH |
![]() |
H & W Development |
Silver
|
0 | DEV |
![]() |
Hariri Pontarini Architects |
Silver
|
16 | INTR • URB • ARCH |
![]() |
Kinetica |
Silver
|
8 | STRC • SEIS |
![]() |
KPMB Architects |
Silver
|
5 | INTR • URB • ARCH |
![]() |
Morrison Hershfield Limited |
Silver
|
2 | ENGO |
![]() |
Pullman |
Silver
|
0 | BMNT |
![]() |
RAW Design Inc. |
Silver
|
2 | ARCH |
![]() |
RDH Building Science Inc. |
Silver
|
0 | FAC |
![]() |
Sigmund Soudack & Associates Inc. |
Silver
|
3 | STRC |
![]() |
Smart Density |
Silver
|
0 | ARCH |
![]() |
Smith + Andersen |
Silver
|
7 | BACS • CON • MEP |
![]() |
Stephenson Engineering Limited |
Silver
|
8 | STRC |
![]() |
SvN Architects + Planners |
Silver
|
0 | URB |
![]() |
Tridel |
Silver
|
4 | DEV |
![]() |
Toronto Metropolitan University |
Nonprofit/Governmental
|
0 | ACAD |
CTBUH Canada Presents Pathway to Net-Zero: What’s Next?
22 November 2022
The CTBUH Canada Chapter is excited to announce…
CTBUH 2022 Global Walking Tour: Toronto
14 October 2022
The CTBUH Canada Chapter is excited to host the…
24 May 2022
Hybrid Timber Tower, Toronto: Achieving 105 Stories & Long Spans Via Steel Cables and Cages
The Hybrid Timber Floor System (HTFS) designed for this project uses post-tensioning cables and steel cages encased in a concrete band and recessed into a...
20 September 2021
The Zero-Carbon Hybrid Future of Tall Timber
A patent-pending Hybrid Timber Floor System (HTFS), with a prefabricated composite floor panel, offers significant advantages over traditional building technology. It is capable of clear...
17 February 2023
Tower Marks Third Proposal for Weston Village Revitalization in Toronto
Revitilizations to Toronto's Weston Village neighborhood have been gathering traction through proposals directly adjacent to GO Transit's Weston Station: Weston Park, and 1830 Weston. Earlier in...