Filter by
Member Since: 2015
Member Offices: New York City
Barker Mohandas, LLC is a US-based, international consultancy providing system design, evaluation and modernization services for vertical transportation (VT) such as elevators or lifts, escalators and moving walks. It deeply understands VT traffic-system design, the building interfaces and codes, history of the design standards and applications today, the engineering of elevator products, and the industry's advanced technologies.
Equally important, its consultancy has a solid track record with a wide variety of projects, from low-rise and ""wide-rise"" -- to the world's largest, tallest, and most complex projects, systems, and problems.
Vertical Transportation Consultant
Membership Level
Silver
Member Since
2015
Member Offices
New York City
Rank |
Name |
Status
Completed Architecturally Topped Out Structurally Topped Out Under Construction On Hold Never Completed Proposed Vision Demolished Competition Entry Canceled Proposed Renovation Under Renovation Renovated Under Demolition |
Completion |
Height |
---|---|---|---|---|
1 |
2022 |
644 m / 2,113 ft |
||
2 |
2017 |
425 m / 1,394 ft |
||
3 |
2020 |
307 m / 1,007 ft |
||
4 |
2019 |
307 m / 1,007 ft |
||
5 |
2020 |
280.2 m / 919 ft |
||
6 |
2020 |
277.6 m / 911 ft |
||
7 |
2018 |
268.1 m / 879 ft |
||
8 |
2018 |
268.1 m / 879 ft |
||
9 |
2018 |
268.1 m / 879 ft |
||
10 |
2018 |
268.1 m / 879 ft |
This presentation covers the innovative techniques and applied technologies for the vertical transportation system for the 1-kilometre, 200+ storey high Nakheel Tower Dubai, which started...
Construction work at Permodalan Nasional Bhd’s (PNB) Merdeka 118 has been delayed by roughly two to three months due to restrictive measures taken to curb...
Investors behind a project valued at Ksh20 billion (US$184 million) in Nairobi's Upper Hill area risk losing their parcel of land over an environmental error. ...
150 m+ Buildings
300 m+ Buildings
Average Building Age*
6 Years
Most Common Function*
Residential, 31 Buildings
Most Common Material*
Concrete, 45 Buildings
* Based on 150 m+ buildings currently in the database.
*Based on 61 Completed & Under Construction Buildings
NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.
NOTE: Gross-to-Net Height is defined as architectural height minus height of highest occupied floor. Therefore, the Gross-to-Net Height is only calculated for buildings that have both the architectural height and the highest occupied floor height recorded.
Create your own charts using the Explore Data tool.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy